Installation of your bathroom
Step 1
Your Skip will be delivered to your home ready for work to begin and allow all waste to be stored in a safe and tidy location until the work is complete.
The Fit team will arrive to begin the removal of your existing bathroom
We will Isolate the hot and cold water supplies to bathroom appliances, drain and remove any radiators.
Remove old appliances, tiles, floor coverings etc.
Step 2
Complete any Room alterations to the walls and add/remove walls to accommodate the new bathroom products that you have chosen.
Reconfigure/extend hot and cold supplies waste pipes to suit new appliances.
Step 3
Replace Bathroom walls with new plasterboard
Begin installation of new Tiles / Wetwall coverings to the newly prepared walls.
Step 4
Fit New Bath / Shower Tray
New flooring to be fitted
Install new Toilet, Shower, Shower enclosure, Towel Rail/ Radiator
Step 5
Final Quality Checking completed by the fitter
Polish and Clean down
Skip will be collected from outside your property.