Installation

Installation of your bathroom

Step 1

Your Skip will be delivered to your home ready for work to begin and allow all waste to be stored in a safe and tidy location until the work is complete.

The Fit team will arrive to begin the removal of your existing bathroom

We will Isolate the hot and cold water supplies to bathroom appliances, drain and remove any radiators.

Remove old appliances, tiles, floor coverings etc.

Step 2

Complete any Room alterations to the walls and add/remove walls to accommodate the new bathroom products that you have chosen.

Reconfigure/extend hot and cold supplies waste pipes to suit new appliances.

Step 3

Replace Bathroom walls with new plasterboard

Begin installation of new Tiles / Wetwall coverings to the newly prepared walls. 

Step 4

Fit New Bath / Shower Tray 

New flooring to be fitted  

Install new Toilet, Shower, Shower enclosure, Towel Rail/ Radiator

Step 5 

Final Quality Checking completed by the fitter

Polish and Clean down

Skip will be collected from outside your property.

Key Info

We will always leave a clean and tidy work area at the end of every day.

We will always leave you with a working toilet overnight.

STIRLING – FIFE – FALKIRK – GRANGEMOUTH – KINCARDINE – ALLOA